Construction on the Fordham Boulevard Sidepath is about to begin.
The sidepath, a paved space designated for cyclists and pedestrians, will run alongside Fordham Boulevard (US 15-501) between Cleland Drive and Willow Drive near University Place. The project’s scheduled finish date is late 2027. The project is funded primarily by DOT.

